Generic Risk Assessment
The foundation template — hazard, who’s harmed, existing controls, risk rating, further action. Drop any task into it.
Editable Word, Excel and fillable-PDF templates for the tasks that come up every week on site. Written against current HSE guidance, reviewed quarterly, free forever.
If your risk assessments look like copy-paste jobs, you’re not alone — but that’s what HSE inspectors are trained to spot. These templates are the same ones our consultants use when we’re out on jobs, stripped of client names and set up so you can adapt them in 10 minutes instead of building from a blank page.
They are editable, white-label, and free to use commercially. Drop your company logo in the header, change the tint if you want to, re-word anything that doesn’t match how you work. You own whatever you produce from them.
The structure of every template maps directly to Regulation 3 of MHSWR 1999 — the duty on employers to carry out a suitable and sufficient assessment of risk. That phrase is the legal bar: if your RA covers the five HSE steps below and someone competent signs it off, you’re meeting it.
HSE’s standard framework — every template in the library follows it.
Walk the workplace, talk to the people doing the task, look at accident records. A hazard is anything with the potential to cause harm — physical, chemical, biological, ergonomic or psychosocial.
Employees, sub-contractors, visitors, members of the public, young persons, lone workers, new or expectant mothers. Different groups face different risks from the same hazard.
Use the Hierarchy of Control: eliminate → substitute → engineering controls → administrative controls → PPE. PPE is the last line of defence, not the first.
If you have 5 or more employees, you must record the significant findings in writing. Every template has a sign-off box — but a signed form isn’t worth much unless the crew has actually been briefed on it.
Reviews are triggered by: new equipment or materials, a near-miss or accident, a change to the task, new legislation, or the scheduled review date. Every template has a review date field — use it.
Click a category to filter. Everything is free — no email wall.
The foundation template — hazard, who’s harmed, existing controls, risk rating, further action. Drop any task into it.
A single workbook to log every active risk assessment on a project — review dates, version, author, linked method statements.
A pocket-sized form for supervisors to record a dynamic re-assessment when site conditions change mid-task. Sign, photograph, file.
WAHR 2005-aligned. Covers avoid / prevent / mitigate hierarchy, fall distance, edge protection, rescue plan and weather thresholds.
Short-duration, light-work tasks only. Includes 1:4 ratio guidance, tie-off requirements, pre-use check and LadderCard sign-off.
Boom, scissor and spider-lift operations. Includes trapping/crushing controls, ground-level rescue plan and IPAF-card verification.
MHOR 1992-compliant, using the HSE’s Manual Handling Assessment Chart (MAC) colour-banding for lifting, carrying and team handling.
Rapid Upper Limb Assessment worksheet for repetitive tasks. Auto-scores posture, force and frequency into an action level (1–4).
Per-substance assessment keyed to the SDS. Covers exposure routes, WEL, controls, RPE/PPE, first aid, spill and emergency actions.
Respirable crystalline silica work-plan — water-suppression, on-tool extraction, RPE selection, exposure time and health surveillance.
For flammable atmospheres — fuel storage, solvents, LPG, dusts. Includes ATEX zoning guide and ignition-source elimination check.
LOLER 1998-aligned. Includes load/SWL calc, radius/boom chart, slinger-signaller duties, ground-bearing check and exclusion zone.
For fixed and rail-mounted tower cranes. Oversailing agreements, anti-collision zones, wind-speed cut-off, climbing & tie-in controls.
Covers welding, grinding, brazing and soldering. Includes 10-metre zone check, 60-minute fire watch, extinguisher provision and sign-off.
Assessment, entry permit, gas-monitoring schedule and rescue plan. References Confined Spaces Regulations 1997.
CAT & Genny scanning record, service-drawing check, shoring method, spoil-heap distance and edge-protection sign-off.
Lock-Out Tag-Out authorisation for electrical isolation work. Isolation point, proving-dead check, padlock ID and re-energisation sign-off.
RRFSO 2005-compliant FRA for workplaces and HMOs. Covers the 5-step PAS 79 method, evacuation plans and significant findings log.
Rolling 12-month log for weekly alarm tests, 6-monthly drills, evacuation times and issues raised — all on one page.
Kitchen, welding-aftermath, hot bitumen, roofing torch residues. Controls, PPE, first-aid provision and incident reporting.
No templates in this category yet.
What an HSE inspector looks for — and what our templates cover by default.
What is actually being done, where, for how long, by how many people. A title like “Roof work” isn’t specific enough — “Repointing chimney stack on 3-storey domestic property using tower scaffold” is.
Each hazard paired with who it might harm — operatives, passers-by, deliveries, roof below. Generic “staff” doesn’t cut it for third parties and public interface.
Eliminate → Substitute → Engineering → Administrative → PPE. Show your working — if PPE is your main control, explain why the higher-order ones aren’t feasible.
Likelihood × severity, scored before and after your controls. Shows the controls are making a difference — and how much residual risk is being accepted.
Name, role, signature, date of assessment, planned review date. If the reviewer isn’t qualified on the task, the assessment isn’t defensible.
Each operative’s name, signature and date confirming they’ve been briefed on the assessment. No briefing record → no defensible RA.
Same hazards, same controls, same wording as every other job. No sign of anyone having walked the actual site.
Site-specific hazards added (public footpath at gable end, pitched-tile roof), generic ones removed, dated the day of the walkaround.
PPE listed for every hazard as if it’s a first-line defence. No engineering or administrative controls upstream.
Elimination tried first (can the task be avoided?), then substitution, then engineering (extraction, guarding), then admin (PTW, training) — PPE as the last line.
Single risk rating at the top, no comparison between pre- and post-controls. No way to see if the controls are meaningful.
Initial rating shown, then controls listed, then residual rating. Where residual is still “medium” or higher — further action or monitoring explained.
Assessor’s name, signature and date — but nothing to show the crew on the ground has ever seen the document.
Each operative’s name, signature and date. Revisited at start of every shift if the task runs for more than one day.
Document dated two years ago, review date expired eight months ago, no version history.
V1.3, last reviewed April 2026, next review October 2026. Trigger events (near-miss, incident, legislative change) flagged on the register.
Yes. Use them on client work, white-label them with your own logo, adapt the wording to how your team works. The only thing we ask is that you don’t re-sell them as a stand-alone product.
They’re written against current UK H&S legislation (MHSWR 1999, HASAWA 1974, sector regulations like CDM 2015 and WAHR 2005) and reviewed quarterly. Compliance is what you do with them on the ground — no template is compliant on its own. A template you’ve adapted, signed, briefed out and reviewed is compliant; a blank template is just a document.
At minimum annually. Sooner if: the task changes, equipment or materials change, a near-miss or accident occurs, or legislation changes. Put a review date in the footer of every RA and flag it in your project calendar.
You need an RA for every hazardous task. A single project-level RA covering the whole job isn’t good enough — the HSE would expect task-level assessments for high-risk activities (hot works, working at height, confined space, lifting, COSHH) plus a project-level register that lists them all.
Yes — our pay-as-you-go service starts at £125 for a bespoke task-level RA, or £350 for a full project suite. See the PAYG CTA below.
Someone with the skills, knowledge, experience and training relevant to the task. For high-risk work that usually means SMSTS/SSSTS-qualified or a specialist card (e.g. IPAF for MEWPs, PASMA for mobile towers, IOSH Managing Safely for office-based tasks).
Our consultants will walk your job, write the RA and method statement, and brief your crew — all under our pay-as-you-go service, no retainer.